Pet Smart Collar GPS with Real-Time Location (Only IOS)

Pet Smart Collar GPS with Real-Time Location (Only IOS)

Green
$177.97 USD
Skip to product information
Pet Smart Collar GPS with Real-Time Location (Only IOS)

Pet Smart Collar GPS with Real-Time Location (Only IOS)

$177.97 USD
đźšš Free Shipping to USA/UK
âś… 30-Day Money Back Guarantee
🛡️European Guarantee — Issued by a certified Norwegian company. One-time purchase, no subscription required.🛡️

  • 2 in 1 Smart Activity Tracker Collar: This Pet Collar is equipped with GPS Tracker which help monitoring your fur-friends activity . Simple, stylish and powerful, this collar provides real-time location updates, geofences, and smartphone apps
  • Anti Lost Function & No Fee: This Dogs & Cats Tracker Collar enable locate your pets. Finding fur-friends through FindMy app, it adapt to the map of your iOS devices. Although you’re far away from fur-friends. And there’s no subscription, no monthly fee
  • All-area Coverage:The collar supports worldwide location tracking. All of North America can be fully covered by our GPS collar. Widely use in many occasions, such as park, mall, block, roadside. Very easy to use
  • Durable & Waterproof Pet GPS Collar: The collar is made of nylon with a smooth PU surface for a stylish look. Besides, the build-in GPS is IP65 waterproof. You needn’t worry about the rain, mist, snow, water. This prolong the life of the device
  • Relax yourself: With our pet GPS tracker, you needn’t worry furry friends out of sight, even if they wander off or get lost. Our real-time tracking capabilities allow to quickly and easily locate your pet.

    Specifications:

    • Material: Faux Leather

    • Battery: CR2032 Button Battery

    • Compatibility: iOS 14.5 / iPhone 6S and above

    • Features: Anti-lost, Adjustable Length, IP67 Waterproof

    • Collar Size: 56cm x 3.1cm

    • Locator Size: 4cm

    • Package Includes: 1 x Pet Collar, 1 x Pet Locator, 1 x User Manual

    Description:

    This pet locator collar offers real-time monitoring to keep your pet safe and secure. Fully compatible with the Apple Find My app (iOS only), it allows you to track your pet's movements and prevent them from getting lost.

    The collar is suitable for small, medium, and large dogs, with an adjustable length for a perfect fit. Powered by a single button battery, it provides an impressive standby time of over 12 months.

    In the event your pet goes missing, simply activate Lost Mode in the Find My app to receive automatic notifications when detected within the network. With an IP67 waterproof and dustproof rating, this collar is built for all weather conditions and outdoor adventures.


Customer reviews

Verified feedback from pet owners

You may also like